Description
Technical Parameters
3/4" Sch40 Buttweld Fitting Carbon Steel Pipe End Cap
| Model NO. | SCH40 | |
| Material: | Carbon Steel | |
| Technics: | Butt Weld | |
| Certification: | ISO, API, ANSI, DIN, JIS, ASME | |
| Application | Building | |
| Thickness | Sch 40, Sch Std, Sch 80 | |
| Size | 1/2′′-48′′ | |
| Transport Package | Wooden Case or Wooden Pallet | |
| Origin | Hebei, China | |
| HS Code | 730793 | |
| Production Capacity | 12000ton/Year | |
Rizhao Azure-B Supply Chain Co.,Ltd is the top steel pipe stockist and distributor in China. As a first-tier agency of several major steel companies in China including TPCO, Baosteel and so on, We are committed to offering an easier way to international trade, leaving clients rest easy. Generally we hold steel pipe stock of at least 15000 tons per months with a sales about 30000 tons per month. In view of the special steel trade system in China, we are a major player in Chinese Steel market.
Q&A
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.
Hot Tags: buttweld pipe end cap, China buttweld pipe end cap manufacturers, suppliers, thick wall pipe cap, water supply pipe cap, polypropylene pipe cap, medium diameter pipe cap, beveled end pipe cap, socket weld pipe cap
3/4" Sch40 Buttweld Fitting Carbon Steel Pipe End Cap
|
Product Description |
|
|
Name |
Pipe cap |
|
Standard |
ANSI B16.9,MSS SP 43, DIN28011, EN10253etc. |
|
Material |
Carbon steel: A234WPB, A420WPL6 St37,St45, E24, A42CP, 16Mn, Q345, P245GH, etc. |
|
Size |
1/2"-48" seamless,50"-1 10"welded |
|
Thickness |
STD, XS, XXS, SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS and etc. |
|
Payment |
T/T L/C |
|
Delivery |
15--30 days |
|
Package |
wooden pallet |
Previous
No InformationNext
Pipe Dish End CapSend Inquiry








